4.
You are reviewing the functions of solid state relay (SSR) functions. The function
of SSR 5 is to control the:
a. Direction of door 1.
b. Air/in/vent valve.
c.
Water to the ejector.
d. Storage of exhaust water.
5.
Each cycle goes through the same series of phases. These phases (in order) are:
a. Ready, conditioning, exposure, exhaust, and complete.
b. Ready, exposure, exhaust, conditioning, and complete.
c.
Ready, exhaust, exposure, conditioning, and complete.
d. Ready, conditioning, exhaust, exposure, and complete.
6.
You are performing operational checkout procedures. After you ensure that the
power at the wall box is on, which task do you perform?
a. Ensure that CB1 and CB2 are off by checking if the green lights above them
are off.
b. Ensure that CB1 and CB2 are on by checking if the green lights above them
are on.
c.
Ensure that the door is open. If not, flip the control board to MANUAL and
energize SSR number five.
d. Ensure that the DS1 on the control board and DS18 on the display board are
lit.
MD0354
1-43