7.
For which of the following conditions, do you use the DOS stockage method for
computing stockage?
a. Used for non-perishable items.
b. Used for items used year-round.
c.
Used for items that are critically short.
d. Used for items with a shelf life of more than one year.
8.
Which of the following is a procedure for calculating stockage using the DOS
stockage method?
a. In the Stock Number block, enter the stock number found on the AMDF.
b. In the Unit Price block, enter the cost of the item as shown in the MCRL 1.
On line one, enter the date. If you use a Julian date, use a four-digit number.
c.
d. On line two, enter the quantity demanded during the control period (180 days).
9.
An UND A is used to request materiel meeting which of the following criteria?
a. Required for immediate end-use and without which the capability of the force to
perform assigned operational missions is impaired.
b. Required of on-schedule repair, maintenance, manufacture, or replacement of all
equipment.
c.
Required for immediate installation on or repair of mission-essential materiel.
Without this materiel, the unit or activity is unable to perform assigned missions.
d. Required for immediate use for installation on or repair of auxiliary equipment.
MD0357
1-25