(7) Date/blocks. Show services scheduled and completed using codes
described in paragraphs 1-2b(7) through (10).
(8)
Remarks.
NOTE:
A system DD Form 314 is needed only to combine NMC time on equipment
reported as a system.
(a) Front side of form. In pencil, note any maintenance data needed:
symbols or subsymbols used, service due dates, and so forth. Services due the following
year are also noted here until they can be carried to a new form.
(b) Back side of form. Refer to figure 1-4. Enter any NMC time
reported as totals by support maintenance. (When support maintenance gives a
day-by-day breakout of NMC time, mark the days in the date blocks.) Also enter the
manufacturer's name and the unit cost for the equipment, if known.
Scheduling intervals are found in individual equipment technical manuals or
NOTE:
manufacturer's literature.
(9)
Date received. Leave blank.
(10) Received from. Leave blank.
Figure 1-4. DD Form 314 (back).
MD0358
1-8