4.
You estimate it will take 12.5 manhours to repair an item of equipment. The
technical inspection will require another 3.5 hours. How much direct labor do you
charge the job?
a. 16 manhours.
b. 9 manhours.
c.
12.5 manhours.
d. 3.5 manhours.
5.
Into which equipment classification do you place a narcotics control cabinet?
a. Indefinite life materiel.
b. Definite life materiel.
c.
Exempt materiel.
d. Non-exempt materiel.
6.
You are processing maintenance data into TAMMIS. You are at the maintenance
system setup procedure menu (3.3.4) and select option 5. What happens?
a. You are immediately given a transaction screen to build the local
team/technician file.
b. You are taken to submenu 3.3.4.1.
c.
You are immediately given a transaction screen to specify optimal stock level
constants for the system.
d. You are taken to the build/update local code tables menu 3.3.4.5.
MD0358
4-19