21.
A written request from the contractor to the contracting officer requesting an item
be accepted with a known variation from the specified requirements is called a:
a. Deviation.
b. Product demonstration model.
c.
Request for waiver.
d. Modification.
22.
A specification is primarily used during surveillance inspections.
a. True.
b. False.
23.
A surveillance inspection performed on a routine basis is called a(n):
a. Cyclic inspection.
b. Warranty inspection.
c.
Original inspection.
d. In-storage inspection.
24.
The Date of Pack (DOP) for operational rations is normally the:
a. Date the components were packaged in their primary containers.
b. Date the components were processed.
c.
Date the components were assembled and packed into shipping containers.
d. Date the components were shipped.