Figure 1-3. Drive motor.
Figure 1-4. Drive shaft.
c. Monthly Preventive Maintenance Checks And Services. As you process
film, by-products are released into the systems. Every month, you should schedule two
additional hours of processor downtime to thoroughly clean the developer, fixer, and wash
systems. Operators perform monthly PMCS after they complete the daily and weekly PMCS.
Teach the operator the following steps.
(1)
Remove the splash guards, cross-overs, and transport racks.
MD0359
1-7