8.
When determining the opening temperature of conveyances, the inspector should
leave the thermometer in place for:
a. 20 minutes.
b. 15 minutes.
c.
10 minutes.
d. 5 minutes.
9.
The requirement for air space at the top of a stack is ____
inches.
10.
In a truck/van, the opening temperature in the
____
of the truck's body,
with the thermometer hung by a
_____
from the ceiling. It should be
at least ________ feet from the floor.
11.
Products may be accepted or rejected on the basis of conveyance temperature. Is
this statement true?
a. Yes.
b. No.
Check Your Answers on Next Page
MD0694
5-9