(b) DA Form 1713-R (DaiIy Water Production Log--Erdlator) (see
figure 5-21).
(c)
DA Form 1713-1-R (DaiIy Water Production Log---ROWPU) (see
figure 5-22).
(d). DA Form 1714-R (DaiIy Water Distribution Log) (see figure 5-23).
(e) DA Form 1716-R (Water Point DaiIy Production Summary) (see
figure 5-24).
(f)
DA Form 1717-R (Water Point DaiIy Distribution Summary) (see
figure 5-25).
(3) Test equipment. The operator should have all required test equipment
in clean, serviceable condition.
(4) Operators. Sufficient personnel should be present to operate the
equipment for extended time periods. Operators should be qualified in the operation of
the equipment and the conduct of necessary tests. They should also be knowledgeable
concerning the regulations and directives under which they are operating.
MD0160
5-37