EXERCISES, LESSON 2
INSTRUCTIONS: Answer the following exercises by circling the lettered response that
best answers the question.
After you have answered all of the exercises, turn to "Solutions to Exercises" at
the end of the lesson and check your answers. For each exercise answered incorrectly,
reread the lesson material referenced after the solution.
1.
Which of the following procedures does the operator perform daily?
a. Remove the racks and rinse them with running water.
b. Verify removable roller gears, sprockets, and idlers are properly engaged.
c.
Remove the squeegee and crossover assemblies and clean the rollers.
d. Clean the replenisher strainers with soap, warm water and a wire brush.
2.
What is the purpose of the splash guard and the rack drip tray?
a. To keep deposits from accumulating on the rack assemblies.
b. To keep the developer solution from contaminating the fixer.
c.
To keep the fixer solution from contaminating the developer.
d. To protect the drive and dryer motors from getting wet.
3.
Which of the following procedures does the operator perform weekly?
a. Lubricate the main-drive chain.
b. Check the calibration of the mixing valve thermometer.
c.
Clean the developer rack rollers with a system cleaner.
d. Drain and refill the main-drive motor gear housing.
MD0359
2-25