6.
Which of the following is a procedure for installing a developer sensor in the AFP
14-X3??
a. Be sure the developer tank is drained completely.
b. Always replace the O-ring and washer.
c.
Tighten the clamp securing the sensor and slide it in.
7.
Which of the following statements is true about the X-OMAT X-ray Film Processor
electrical sequence of operation?
a. The dryer heater is energized before the developer heater.
b. The developer heater is energized before the dryer lamp light comes on.
c.
The replenisher pump motor is only energized when you feed film into the
processor.
d. The replenisher pump motor is energized before the recirculation pump motor
is energized.
8.
What does the K2 relay control on the X-OMAT X-ray Film Processor?
a. It energizes the dryer heaters and dryer lamp which turns on.
b. It energizes the replenisher pump motor which starts.
c.
It sets the time interval for the signal bell to feed film.
d. It allows the power sharing pulse to clock through U4-8, setting U4-4 low.
MD0359
4-32