EXERCISES, LESSON 4
INSTRUCTIONS: Answer the following exercises by circling the lettered response that
best answers the question.
After you have answered all of the exercises, turn to "Solutions to Exercises" at
the end of the lesson and check your answers. For each exercise answered incorrectly,
reread the lesson material referenced after the solution.
1.
Which of the following statements is true about the operation of the AFP 14-X3 X-
ray Film Processor?
a. When you first turn on the ON-OFF switch S1, the developer heater heats the
developer up to set temperature at the same time the dryer heater heats the
dryer to set temperature.
b. In the standby mode, both developer and dryer temperatures are maintained.
c.
The replenishment pump operates while film is activating the entrance switch,
adding developer and fixer.
d. During the standby mode, the processor periodically enters a jog cycle (for 20
seconds every 5 minutes).
2.
Which of the following are the three electronic circuit boards for the AFP 14-X3?
a. The electronics board, triac board, and the replenishment board.
b. The developer board, the fixer board, and the dryer board.
c.
The opto-isolater board, the hysteresis board, and the thermistor board.
d.
The power board, the temperature board, and the timing board.
MD0359
4-30