(b)
Consider one equipment day to be a single item or system on-hand
for one day.
(c) Include equipment on-hand for any part of the report period on the
DA Form 2406 for that period.
(d) Determine the date the item arrived from the property book office.
(16) Block 9e(2), Available days.
(a) Enter the total number of days the equipment was FMC during the
period. (Available days equal the possible days minus the nonavailable days.)
(b) Determine a system is FMC if each authorized subsystem in
Appendix B2 of AR 700-138 is FMC and on-hand.
(c)
Ensure there is an entry if column 9d(2) has an entry.
(d) To determine the FMC percentage, divide the total available days
by the total possible days and multiply by 100.
(17) Block 9e(3), Nonavailability days.
(a) Using the DD Form 314 for the item of equipment, copy the total
number of days the equipment was NMC at organization level for supply (NMCS) and
maintenance (NMCM) during the report period to block 9e(3)(a) of the DA Form 2406.
(b) Using the DD Form 314 for the item of equipment, copy the total
number of days the equipment was NMC at support level for supply (NMCS) and
maintenance (NMCM) during the report period to block 9e(3)(b) of the DA Form 2406.
(c) Verify the sum of the entries in column 9e(3) equals the entry in
column 9e(1) minus the entry in column 9e(2).
(d) Verify the entries in columns 9e(1) and 9e(2) are equal if there are
no nonavailable days in column 9e(3).
(18) Use columns 9f(1) through 9f(5) as a worksheet for the Unit Status
Report. See AR 220-1 for further explanation and figure 1-15 for a completed DA Form
2406.
MD0358
1-29